Drawings and confidentiality
Share a clearly identified revision for engineering review and agree on confidentiality before sending restricted designs.
Send files that can be compared
- 3D and 2D
Send the current 3D model and its corresponding 2D drawing. Confirm the preferred file formats with the project team.
- Revision and units
Identify the part number, revision and units, and flag differences between the model and drawing before review.
Highlight the dimensions that matter
- Function and appearance
Mark tolerance-critical features, reference datums and cosmetic surfaces. Add assembly views or reference photos when they help explain fit or finish.
- Change control
Send revised files with a short list of changes and state which revision should govern manufacture and inspection.
Agree confidentiality and send
- Initial contact
If your drawings are confidential, send an initial project description and request an NDA discussion before sharing them.
- Email handoff
The enquiry form prepares a draft. Attach drawings in your email application, verify the recipient and send when ready.